You don't have javascript enabled. Good luck with that.
Pencarian
 Genangan Air Rendam 19 RT di Bukit Duri
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

19 RTs in Bukit Duri Inundated

A number of residential in Bukit Duri Urban Village, Tebet, inundated after Ciliwung River overflowed. The flood inundates 19 RTs that spread in RW 10, 11 and 12 with water level up to 1.5 meters.

Six refugee camps also have been set up at urban village office, PKK building, train depot, Attahiriyah Mosque, Garuda Housing Complex, Al-Akmal

Bukit Duri Urban Village Head, Mardi Youce said, from 19 RTs, 9 out of them are in RW 10, 4 RTs in RW 11, and 6 RTs in RW 12. Thus far, there has been no evacuation from residents. 

Jalan Makasar Paralyzed Due to Inundation

"Six refugee camps also have been set up at urban village office, PKK building, train depot, Attahiriyah Mosque, Garuda Housing Complex, Al-Akmal," he stated, Thursday (4/21).

He added, until 7 PM, water level is varied. In RW 10, water level reaches 25 centimeters-1.5 meters, RW 11 with 10-50 centimeters, and RW 012 with 60 centimeters-1.5 meters.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye401 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye396 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye275 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye272 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik